Decca Recruiting

Tulsa

QA QC Inspector

Shift 7-4 or 8-5 Under direct supervision, responsible for performing quality evaluations on standard and routine processes and products according to engineering drawings, specifications, prescribed methods, and instructions. Performs inspection of various operations activities. Identifies and reports non- conformance to known standards using various measuring and testing methods. May perform final adjustments. Generates reports of …

QA QC Inspector Read More »

Machine Operator 2nd Shift

Under general supervision, sets up, adjusts, and operates a variety of machine tools which may include numerical control/computerized numeric control lathes, mills, drills, computerized numerical control/numerical control and /or manual machines. May be required to read blueprints, perform varying levels of shop mathematics associated with machining operations, and perform inspection procedures to verify work. May …

Machine Operator 2nd Shift Read More »

Material Coordinator

Possibility Expected start date: As soon as possible Shift, hours, rotation: 7:00 am to 5:30 pm M-F Is this role remote? No Top three skills needed to perform this role: Valid drivers license Forklift – Will certify on location Machinery/tools used: Forklifts/Pallet Jacks Is this a Field or Non-Field Role? (Will this work be performed …

Material Coordinator Read More »

ELECTRICAL ENGINEER – PCB DESIGN

We are searching for a PCB design EngineerSomeone with Embedded harware backgroundAnalog to Digital – preferably worked on gaugesUnder broad direction, provides expertise and guidance in analysis, modification and designs for multiple projects and/or projects of great complexity. Requires the ability to trade off innumerable, complex, highly interdependent variables and make timely decisions.Considered a subject …

ELECTRICAL ENGINEER – PCB DESIGN Read More »

Assembly & Repair Tech (2nd Shift ONLY)

Length of Assignment: 6-9 months Will worker convert to FTE? Potentially Expected start date: 2 weeks from offer acceptance Shift, hours, rotation: 2nd shift 3p-11p Is this role remote? No Top three skills needed to perform this role:

Material Coordinator

rotation: 1st 8am-5pm or until job is done 2nd 3pm-12am or until last job is shipped. Is this role remote?No Top three skills needed to perform this role:

Machine Operator 2nd Shift

Length of Assignment: 90 days Will worker convert to FTE? Probably Expected start date: Asap Shift, hours, rotation: 2nd shift, 3-12, M-F Is this role remote? No Top three skills needed to perform this role Please list any required certifications (i.e. SafeLand, H2S, forklift, etc.) needed for this position. none Machinery/tools used: Manual/CNC Lathe or …

Machine Operator 2nd Shift Read More »